Response from Dr Janet Eccles (Individual)
1. Dr Janet Eccles (Individual) : 8 Feb 2018 10:28:00
Please make your comments in the box below:
With reference to the Plan, I would like to point out that sufficient attention has not been paid to the issue of potential flooding, due to a unique combination of natural drainage channels in the underlying limestone, local topography, the coastal railway embankment preventing surface rainwater run-off from flowing into Morecambe Bay and the lack of spare capacity in the Victorian combined sewer. This information needs to be added as does a requirement for a comprehensive hydrological survey to confirm that future developments will not cause or exacerbate flooding.
Secondly, there is no mention of the need to improve traffic flow in the town centre. The provision of a one-way system perhaps and/or imposition of weight restrictions for through traffic should improve traffic flow and parking and should be an essential part of the PLan, given the huge burden that will be placed on present infrastructure by the addition of so many new houses/businesses, not to mention the present infrastructure's potential to cause a number of traffic and pedestrian accidents.
Thirdly, why is there no mention of the reinstatement of Berner's Bridge? A recent report to SLDC identified its reinstatement as essential for the success of any Lido project, an amenity which would enhance the tourist potential but would also benefit residents. Many of us residents contributed considerably to the new swimming pool, only to see it close in a ridiculously short time and for houses to be built instead.
Janet Eccles